Inspection checklist for EXCAVATION & P.C.C.
Aug 5, 2022
CHECKLIST EXCAVATION & P.C.C.
- Final plinth levels of all buildings.
- Strata as per consultant’s specifications.
- The size of the holes is further than the size of P.C.C., & depth as asked.
- Shuttering provided, if required.
- Uniformity & thickness of soling.
- Compaction of concrete.
- The thickness of P.C.C. is specified.
- Curing for 7 days.
Read More: Inspection Checklist For RCC Columns | Civil Engineering